Practice question 264 of 400 · hard
A report takes twelve minutes. The client needs an immediate acknowledgement and later status, and the report must survive host replacement. Which two design choices fit? Select 2 answers.
Select all that apply. Every correct option and no extras are required for credit in the app.
Show the answer and explanation
✓ Correct answers
- Return an accepted response with a status location
- Queue the work or use a durable workflow with external progress state
Accepted/status semantics and queued or durable processing separate the request lifetime from long work and persist progress. A longer function execution setting does not remove the documented HTTP response limit, host memory is not durable, and legacy Consumption has a maximum execution duration rather than unlimited uninterrupted runtime. Source guide: PDF page(s) 47-48.
This item is flagged for content review.
Read and review here, or open the app to practise and save your results on this device.
Unofficial study aid; not affiliated with or endorsed by Microsoft. Original practice questions are not real examination questions and do not guarantee an exam result.