StudyByteLearn
← AZ-305: Azure Infrastructure Solutions
AZ-305 · Migration design

Practice question 383 of 400 · medium

A large eligible dataset cannot be uploaded over the WAN within the migration window. The data continues to change. Which plan best fits?

Choose the single best answer.

  1. A.Data Box with no allowance for ordering, shipping, or ingestion
  2. B.Data Box for the bulk load followed by validated delta synchronization and cutover
  3. C.A DNS switch before any source data is transferred
  4. D.A resource tag that automatically transfers source data
Show the answer and explanation

✓ Correct answer

  • Data Box for the bulk load followed by validated delta synchronization and cutover

Physical bulk transfer can address bandwidth limits, but logistics and subsequent changes still require a consistency plan. Ignoring device timing or using tags or premature DNS changes does not transfer a usable dataset. Source guide: PDF page(s) 64.

Read the source reference

This item is flagged for content review.

Read and review here, or open the app to practise and save your results on this device.

Unofficial study aid; not affiliated with or endorsed by Microsoft. Original practice questions are not real examination questions and do not guarantee an exam result.